1. Home
  2. Service
  3. Charges

Service

Charges


In accordance with consumption tax law, 8% consumption tax shall be imposed separately on the rate stated in the list.

[Regulations of Hakata Port Facility Management]
[General/Special Use]

Berth and Landing Stage

Classification Mooring Hours Rate(Unit:Yen)
Per GT Berths for large vessels
(over 6 meters in depth)
less than 2h 6.1
2 -12h 9.15
over 12 - 24h 12.2
over 24h *For moorage of more than 24h, \6.10/GT is additionally charged for every 12h.
Berths for small vessels
(less than 6 meters in depth)
less than 2h 4.8
2 -12h 5.85
over 12 - 24h 6.9
over 24h *For moorage of more than 24h, \3.45/GT is additionally charged for every 12h.
Deduction for international liners
a) Volume-based incentive
- 30% of the charge is discounted on vessels of over 10,000GT but less than 30,000GT.
- For vessels of over 30,000GT, 50% of the charge on tonnage exceeding 30,000GT is discounted .
b) 50% of the charge is discounted on Sunday for vessels that regularly undergo cargo handling activities on Sunday.
c) No vessel of less than 10,000GT is charged for the first three visits only when a new route opens.
Note: a) and b) can not be combined.

Pontoon

Classification Mooring Hours Rate(Unit:Yen)
Per GT less than 2h 6.1
2 -12h 9.15
over 12 - 24h 12.2
over 24h *For moorage of more than 24h, \6.10/GT is additionally charged for every 12h.

Mobile Bridge for Car Ferries

Classification Rate (Unit:Yen)
Per moorage 3,200

Dolphin

Classification Gross Tonnage Rate (Unit:Yen)
For each 24h moorage Vessels of less than 1,000GT 5,000
Vessels from 1,000 to less than 3,000GT 10,000
Vessels from 3,000 to less than 5,000GT 14,900
Vessels from 5,000 to less than 10,000GT 22,300
Vessels from 10,000 to less than 15,000GT 37,200
Vessels of 15,000GT and over 44,600

Transit Shed

Classification Storage Period Rate(Unit:Yen)
Per m2/day
(General Use)
1-15 days
No foreign trade cargo is charged for the first three days.
7.1
16 - 30 days 15.3
31 days and over 38
Per m2/month
(Special Use)
- 200

Office Attached to Transit Shed

Classification Rate(Unit:Yen)
Per m2/month (Special Use) 615

Fruit and Vegetable Shed

Classification Rate(Unit:Yen)
Per month (Special Use) 8,069,000

Domestic Trade Container Shed

Classification Rate(Unit:Yen)
Per month (Special Use)
2,200,000

Foreign Trade Container Shed

Classification Rate(Unit:Yen)
Per month (Special Use)
2,100,000

Ro/Ro Cargo Shed

Classification Rate(Unit:Yen)
Per month (Special Use)
1,987,000

Administration Building

Classification Period Rate(Unit:Yen)
Meeting room Per h 1,700
Office Per m2/month (Special Use) 1,900
Gate Facility Per month (Special Use) 300,000
Others Per m2/month (Special Use) 2,000

Inspection Facility

Classification Rate(Unit:Yen)
Per inspection per container 1,000

Maintenance and Repair Facility

Classification Rate(Unit:Yen)
Per month (Special Use) 961,400

Freight Sorting Yard

Classification Period Rate(Unit:Yen)
Per m2/day
(General Use)
Paved area 1 - 15 days 5.5
16 - 30 days 11.1
31 days and over 22
Unpaved area 1 - 15 days 2.8
16 - 30 days 5.1
31 days and over 10.2
Per m2/month
(Special Use)
Paved area 127
Unpaved area 71

Cargo Handling Equipment for Grain and Attached Facility

Classification Rate(Unit:Yen)
Per set of 5 equipments per month(Special Use) 13,500,000

Gantry Crane

Classification Rate(Unit:Yen)
Per crane/30min 26,000
a)The charge is reduced to \23,000/30min on Sunday when vessels that regularly undergo cargo handling activities on Sunday.
b)\1,200 is subtracted from the charge of each transshipment cargo per use.

Reefer Plug

Classification Rate(Unit:Yen)
Per plug/h 120

Open Storage Yard

Classification Storage Period Rate(Unit:Yen)
Per m2/day (General Use) Paved Area 1 - 15 days 5.5
16 - 30 days 11.1
31 days and over 22
Unpaved Area 1 - 15 days 2.8
16 - 30 days 5.1
31 days and over 10.2
Per m2/month (Special Use)  Paved Area   127
Unpaved Area   71
Mayor-designated Area   102

Multistory Automobile Storage Facility

Classification Rate (Unit:Yen)
Per month (Special Use) 11,500,000

Timber Basin

Classification Storage Period Rate (Unit:Yen)
Per m2/day (General Use) 1 - 45 days 0.7
46 days and over 1.1
Per m2/month (Special Use) Type 1 9
Type 2 12

Water Supply Facility at Berth

Classification Rate (Unit:Yen)
In the case of bad weather or out of office hours, 50% of the charge will be added. Up to 3t 2,190
Per ton for over 3t 730

Port Facility Site

Classification Rate (Unit:Yen)
Cranes Per crane per month For boom length of less than 7m 2,700
For boom length of over 7m 4,000
Others Per m2/month 161

Hakata Pier Passenger Terminal and Attached Facilities

Classification Rate (Unit:Yen)
Per month (Special Use) 1,800,000

[Use for Other Purposes]

Transit Shed

Classification Rate (Unit:Yen)
Per m2/month 615

Freight Sorting Yard and Open Storage Yard

Classification Rate (Unit:Yen)
Per m2/month (In the case of installment of utility poles and pipes etc., the regulations of road utilization charges of Fukuoka City shall be applied and the rate shall be calculated accordingly.) Paved Area 191
Unpaved Area 118

Timber Basin

Classification Rate (Unit:Yen)
Per m2/month 20

Port Facility Site(exclusive of harbour road site)

Classification Rate (Unit:Yen)
Per m2/month (In the case of installment of utility poles and pipes etc., the regulations of road utilization charges of Fukuoka City shall be applied and the rate shall be calculated accordingly.) Site for Sheds and Warehouses 241
Shed Rooftop 80
Other Sites Paved Area 214
Unpaved Area 133

Harbour Road Site

Rate
The regulations of road utilization charges of Fukuoka City shall be applied and the rate shall be calculated accordingly.

[Regulations of Port Dues at the Port of Hakata]

Port Dues

Classification Rate (Unit:Yen)
Per GT (No vessel of less than 700GT is charged.) International service 2.60
Domestic service 1.30
Note: 50% of the charge (\1.30/GT) is discounted for international liners.
[Regulations of Hakata Port International Terminal]

Hakata Port International Terminal

[General/Special Use]
Classification Rate
(Unit:Yen)
Terminal Utilization Per person on embarkation 6 -11 years old 250
12 years old and over 500
Inspection facility and terminal for international passengers Per use 3,500
Boarding Bridge Per equipment per day 35,000
Baggage Office Per hour 406
Baggage Room Per room per hour 6,100
Freight Sorting Yard Per room per day 4,200
Per room per hour 530
Terminal Hall (RoomA/B)
Per room
Up to 1h 20,000
over 1 - 3h 30,000
over 3 - 5h 40,000
Over 5h 60,000
Meeting Room Per room Up to 1h 5,200
over 1 - 3h 10,400
over 3 - 5h 15,600
Over 5h 26,000
Special Reception Room Per room Up to 1h 5,200
over 1 - 3h 10,400
over 3 - 5h 15,600
Over 5h 26,000
Waiting Room Per room per hour 320
Car Parking Per car per use Every 30 min 100
Over 4.5 - 24h 1,000
Over 24h For use of more than 24h,¥1,000 is charged every 24h and the rate for less than 24h is calculated accordingly as stated above
Office  Per m2/month In the case of utilization by national or local authorities 1,750
Others 2,000
Shop Per m2/month Type 1 3,000
Type 2 2,000
Warehouse Per m2/month 2,000
Car Parking for Business Use Per car/month (Exclusive of buses) 15,800
Electric Bulletin Board Per board per month. [In the case of commercial use by those who do not have permission for special use (exclusive of electric bulletin board use only), double rates shall be charged.] 12,000
Note: Double rates shall be charged in case users of the terminal charge admission fee.
[Special Use]
Classification Rate
(Unit:Yen)
Observation Deck Per m2/month 280
Per m2/day 28
Indoors In the case of commercial use by those who do not have permission for special use (exclusive of electric bulletin board use only), tenfold rates shall be charged. Floors Per m2/month 2,000
Per m2/day 200
Walls Per m2/month 1,000
Per m2/day 100
Outdoors
(Exclusive of observation deck)
In the case of installment of utility poles and pipes etc., the regulations of road utilization charge of Fukuoka City shall be applied and the rate shall be calculated accordingly. Per m2/month 560
Per m2/day 56

Inquiries for Other Charges

Pilotage Hakata Pilot Association TEL:092-291-4494
Tuggage Hakata Port Towage Cooperative TEL:092-674-4600
Line handling Hakata Port Service Center TEL:092-641-8831